The project included the construction of a 26-ft steel tower equipped with scientific monitoring equipment and a corresponding instrument hut to house data collection tools. The area immediately surrounding the tower and instrument hut was preserved to maintain the environmental integrity of the area during construction. Elevated boardwalks were installed around the tower and hut for access and to minimize the site disruption.