This facility includes 10,400 sq. ft. of office space and training classrooms, an 8,400 sq. ft. area for pipe and spiral duct fabrication with a 5-ton overhead top-running crane, and a 4,000 sq. ft. vehicle maintenance and repair garage.
RK Mechanical remained fully operational throughout the three-phase construction process, which consisted of interior demolition, the erection of a second-story structural slab on deck for additional office space, and tenant finish.